Our quality assurance system is certified in accordance with the ISO 9001:2008 & AD 2000- Merkblatt/WO and Pressure Equipment Directive (PED) 97/23/EC standards. An independent quality assurance department is responsible for all working procedures required to ensure that all manufacturing processes are carried out in accordance with international technical delivery conditions like ASTM/ASME, DIN, NFA,ISO & EN with the customer specifications.
Scorodite has several third party approvals for their manufacturing process as well as customer approvals.
Third party approvals:
- LLoyds
- Bureau Veritas
- Det Norske Veritas
- SGS
- Germanischer Lloyd
- PED
- TATA Projects
- HPCL
- CPCL
- RCF
- ICF
- Indian Railway
- Rites
- PDIL
- IOCL
- GAIL
- NTPC
- BARC
- HAL
- BHPV
- IBR
- Mazagon Dock etc
Destructive & non-destructive testing
In assuring the quality of our products, our own in-house testing facilities.
Destructive testing includes:
- tensile tests
- impact tests
- bend tests
- hardness tests
- intercrystalline corrosion test in accordance with ASTM A262 practice E
- pitting corrosion test in accordance with ASTM G48A
- metallurgical tests (metal analysis, macro & micro examination)
Non-destructive testing includes:
- eddy current testing
- ultrasonic testing
- hydro testing
- x-ray testing (radiographic & radioscopic)
- positive material indentification testing (PMI)
- Spectro
For the purposes of non-destructive testing we have at our disposal state-of-the-art equipment for ultrasonic and radiographic examination, eddy current testing and hydrostatic testing.